HEYDAR ALIYEV

User avatar
Henk
Posts: 19285
Joined: Fri Jul 23, 2010 3:23 pm
Location: Breskens

HEYDAR ALIYEV

Post by Henk » Sun Aug 31, 2014 6:53 pm

HEYDAR ALIYEV
A.P.Møller-Mærsk A/S (Maersk Drilling) - Baku
Ordered 01-01-2001; keel laid 23-07-2001; delivered 24-10-2003 hull Keppel FELS - Singapore; completed at Caspian Shipyard Co.Ltd. - Baku (B.251/ H.103)
104,34 x 64,50 x 34,98 x 20,50 m; drill depth 1.000 m;
20.620 grt; 14.080 dwt
8765565
Cranes 1x KRENZ 40 tons; 1x KRENZ 60 tons; 1x Hydralift Knuckle-boom
Bunkers 870 m³
Drillwater 1.210 m³
Potable water 600 m³
Mud: Liquid 650 m³; bulk 452 m³
Cement 452 m³
Pumps 3x Wirth 2.200 bhp, 7.500 PSI; 750 tons each
Engines 4x 4SA V16 cylinder Wärtsilä type 16V200
Generators 4x ABB Industries type AMG710S6 each 2700 kW/
130 persons
In the fleet 12-01-2011 named MÆRSK EXPLORER from A.P.Møller-Mærsk A/S (Maersk Drilling) - Esbjerg

Photo: Mærsk
Attachments
heydar_aliyev.jpg
Henk de Winde

Return to “Drilling”

Who is online

Users browsing this forum: No registered users and 1 guest